I recently returned from a trip to Rajasthan, India. While there, I came across an off-grid power opportunity
at the Amber Fort near Jaipur. The fort
has a restaurant and gift shop facilities (with a stereo and satellite TV – see
the video I took). The facility is
powered by a Cummins diesel genset.
When I saw diesel genset, I became curious about the
levelized cost of energy (LCOE) for this off-the-grid system. Here is a spreadsheet where I made some guesses
about the system cost. I came up with a
resulting LCOE of $0.3144/kWh for the power from the diesel genset. I tried to make assumptions that if anything
would bias to cost to be lower than what it actually is. $0.31/kWh is a high price for electricity and
provides an attractive opportunity for distributed solar and wind power. While travelling through India I saw a number
of off-grid communities, so I expect India to be a large market for distributed
clean power.
No comments:
Post a Comment